Planned maintenance window for Switchback

Last Updated : Mar 27, 2023 |

Planned maintenance windows for switchback require planning and scheduling for the switchback. During the maintenance window, the solution is out of operation. However, the time for switchback varies depending on whether you implemented a partial or full DR switchover.

The other major difference between a switchback and a switchover is that you must reinstate all failed elements that caused a switchover in DC1 before the switchback can take place and restore normal disaster recovery functionality.