Branch Gateway and EM200 installation

Last Updated : Feb 07, 2022 |
Prolog information
Branch Gateway installation includes the following steps:
No.
Task
Reference
1
Install the Branch Gateway chassis.
2
Install the EM200 expansion modules.
3
Install media modules.
4
Attach ground conductors.
5
Connect EM200 to a power source.
6
Connect Branch Gateway to a power source.