Adding CPU and memory to a node

Last Updated : Mar 20, 2026 |
Prolog information
Use this procedure to increase node CPU and memory resources when not also increasing SDS disk size or a upgrading software. For example, when adding a product.
Before you begin
  • You must plan a maintenance window to perform this task.
  1. Open the same deployment spreadsheet that is configured to install or upgrade the cluster in the Avaya Analytics™ 4.3.1.1 release.
  2. Make a note of the current SDS disk, CPU and Memory requirement for the installed cluster.
  3. For increasing the agent count of the cluster, select the New deployment size from the dropdown menu on the orca tab.
  4. For adding a new feature such as Async or historical agent trace reporting, enable the feature on the respective tab.
  5. Compare the new footprint values with the old values and make note of any differences in the SDS disk, CPU and Memory. If there is no need to increase the disk size, skip the Increasing SDS disk size for a node section and ensure an infrastructure upgrade is not performed as a part of the CPU and Memory increase as this will result in a failure.
  6. Power off the cluster nodes.
    ADDITIONAL INFORMATION:
  7. In vCenter, on each cluster node VM, edit the settings to increase the CPU and memory resources as required.
  8. Power on the cluster nodes.
    ADDITIONAL INFORMATION:
  9. Log in to Cluster Control Manager with your customer account.
  10. Copy the deployment spreadsheet to the CCM server.
Result
After this procedure, the cluster nodes are running with the new CPU and memory resource allocations.