Save each solution image as a gzip file. Perform this procedure using the ccm-ctl-agn container.
Before you begin
Download the chart and images to the laptop using the Cluster Control Manager air gap network container.
Start the Cluster Control Manager air gap network container (ccm-ctl-agn) on the laptop.
Using the ccm-ctl-agn deployed container on the laptop, run the agn save command to save the downloaded images for the solution as a set of gzip images.
From the /root/downloads directory of the running ccm-ctl-agn container, run the tar -zcvf downloads.tgz ../downloads command.
Transfer the tar file to Cluster Control Manager using a thumb drive or a similar media device.
ADDITIONAL INFORMATION:
The file path in Windows is C:/Avaya/Downloads/downloads.tgz.