Save the Cluster Control Manager upgrade image as a gzip file using the ccm-ctl-agn container.
Before you begin
Download the Cluster Control Manager upgrade image to the Docker cache on your computer.
Start the Cluster Control Manager air gap network container (ccm-ctl-agn) on the laptop.
Using the ccm-ctl-agn deployed container on the laptop, run the agn ccm-upgrade save <CCM upgrade version> command to save the downloaded Cluster Control Manager upgrade image as a gzip file.
ADDITIONAL INFORMATION:
Replace <CCM upgrade version> with the version number of the Cluster Control Managerccmupgrade image.
Example:agn ccm-upgrade save 1.3.0.2.242002
After saving the upgrade image as a gzip file, from the /root/downloads directory of the ccm-ctl-agn container, run the tar -zcvf downloads.tgz ../downloads command.
Transfer the tar file to Cluster Control Manager using a thumb drive or a similar media device.
ADDITIONAL INFORMATION:
The file path in Windows is C:/Avaya/Downloads/downloads.tgz.