Use this procedure to upgrade Cluster Control Manager. The upgrade takes about 15 to 20 minutes to complete. When the upgrade completes, the upgrade utility exits and the Cluster Control Manager automatically reboots.
Before you begin
Download the CCM upgrade Docker image to your laptop or PC
Upload the CCM upgrade Docker image to CCM
If an upgrade configuration yaml is provided by your solution, transfer the CCM upgrade-config.yaml file to Cluster Control Manager by using a file transfer utility, such as WinSCP.
Log in to the Cluster Control Manager (CCM) console as the customer user.
Create the upgrade configuration yaml.
ADDITIONAL INFORMATION:
Note:
If an upgrade configuration yaml is provided by your solution, use that file and skip this step.
Type vi /home/<customer account directory>/upgrade-config.yaml
Enter the version string from your solution documentation.
If the upgrade fails with an error, resolve the issue causing the failure and restart the upgrade by reverting to your snapshot and running the ccm upgrade system upgrade-config.yaml command.
ADDITIONAL INFORMATION:
For more information about troubleshooting installation failures, see the Maintaining and Troubleshooting Avaya Analytics™ for Avaya Oceana® document.