Uploading the solution gzip images and charts onto Cluster Control Manager

Last Updated : Oct 19, 2021 |
Prolog information
Upload the solution gzip images and charts onto the Cluster Control Manager local Docker registry and chart museum using the agn command on Cluster Control Manager.
Before you begin
  • Save each solution image as a gzip file.
  • Transfer the solution downloads.gzip file to the /var/avaya/artifactCache directory on Cluster Control Manager.
  • Set up Cluster Control Manager for offline deployment.
  • Start ChartMuseum and Docker registry on Cluster Control Manager.
  1. On Cluster Control Manager, extract the Downloads tar file using tar -zxvf downloads.tgz to the /var/avaya/artifactCache directory if enough space is available.
    ADDITIONAL INFORMATION:
    You can run df -h to see how much disk space is available. If the tar file is larger than half the disk space available, extract the file to a different server in the air gap network and then transfer it to Cluster Control Manager using an SCP client.
  2. Run agn load -d <full path to Downloads directory> -h <Cluster Control Manager FQDN> to upload the solution gzip images and charts.
    The following is an example of this command:
    agn load -d /var/avaya/artifactCache/downloads -h ccm.server.example.com
  3. When prompted, enter the user name and password to access the local Cluster Control Manager Docker registry and chart museum.
Result
After you upload all images and charts, the Cluster Control Manager local Docker registry and chart museum are staged for cluster deployment.