Testing transfer of control from survivable core server to main server

Last Updated : Nov 12, 2024 |

About this task

You can expect the following event to occur:
  • The survivable core server loses control of all media gateways and media servers under its control as the gateways and media-servers move back to main.

This test takes several minutes.

Use this procedure to test the ability of the main server to assume control of the media gateways and media servers that are currently under control of the survivable core server. Perform the following steps to execute this test.

Procedure

  1. Verify that the mg-recovery-rule and ms-recovery-rule is set to manual.
  2. Verify that the survivable core server is in control of the media-gateways and media servers being tested by executing the list media-gateway and list media-server command from the main server. The status of the port networks being tested is shown as rd.
  3. On the main server, execute the SAT command, enable mg-return all and enable ms-return all.
    Caution:

    This test is service affecting.