Upgrade Job Status field descriptions

Last Updated : Jan 18, 2021 |
Prolog information
Name
Description
Job Type
The upgrade job type. The options are:
  • Refresh Element(s): To view refresh elements jobs.
  • Analyze: To view analyze jobs.
  • Pre-Upgrade Check: To view preupgrade check jobs.
  • Upgrade: To view upgrade jobs.
  • Commit: To view commit jobs.
  • Rollback: To view rollback jobs.
  • Uninstall: To view uninstall jobs.
Job Name
The upgrade job name.
Start Time
The time when the system started the job.
End Time
The time when the system ended the job.
Status
The status of the upgrade job. The status can be:
  • ,
  • .
  • % Complete
    The percentage of completion of the upgrade job.
    Element Records
    The total number of elements in the upgrade job.
    Successful Records
    The total number of times that the upgrade job ran successfully.
    Failed Records
    The total number of times that the upgrade job failed.
    Button
    Description
    Delete
    Deletes the upgrade job.
    Re-run Checks
    Performs the upgrade job again.
    Edit Configuration
    Displays the Upgrade Configuration page where you can change the upgrade configuration details.