Network requirements

Last Updated : Jan 23, 2023 |
Prolog information
Before deploying your contact center, ensure the following:
  • The network latency without call failures under load between the contact center servers in the same data center is not more than 50 milliseconds.
  • The network latency between data centers must not exceed 250 milliseconds.
  • Avaya Contact Center – Extended Capacity provides the ability to assign a virtual IP address to the server network interface.
  • Layer 2 switches must be connected in a redundant manner in each data center.