Migrating multiple times
Normally, migration is completed in one attempt and a summary of the migration is provided on the user interface. However, in case of a network failure or system shutdown midway through a migration, administrators can perform the migration again. If migration is initiated for a second time, IP Office identifies and removes the migrated data from the previous unsuccessful migration before starting. Migrated connectors are deleted unless they have already been renamed.