Demand testing

Last Updated : Apr 22, 2014 |
Prolog information
Any other kind of maintenance testing apart from periodic, scheduled, fixed-interval testing is referred to as demand tests.
  • Includes periodic tests. Other tests are required only when trouble occurs.
  • Can be run by the system when the system detects a need or can be run by maintenance personnel in troubleshooting activities.
  • Using the management terminal, maintenance personnel can demand the same tests that the system initiates in periodic or background testing.
  • Some non-periodic demand tests are destructive (service-disrupting) tests, and are identified in boldface type.