Removing a scheduled backup

Last Updated : Apr 28, 2014 |
Prolog information
Use this procedure to remove a scheduled backup from the list.
  1. Log in to the System Management Interface (SMI).
  2. From the left side select Data Backup/Restore Schedule Backup.
    ADDITIONAL INFORMATION:
    The Schedule Backup page displays any previously-scheduled backups by type.
  3. Click the radio button to the left of the scheduled backup that you want to remove.
  4. Click Remove.
    ADDITIONAL INFORMATION:
    The system verifies the request.