Gracefully power off the single-node cluster

Last Updated : Oct 28, 2022 |

About this task

Use this procedure to gracefully power off the single-node cluster (target system).

Before you begin

  • Deploy single-node cluster for migration.

  • Migrate the Avaya Analytics™ Crunchy 2 to Crunchy 5 environment.

  • Prepare Avaya Analytics™ deployment spreadsheet to upscale single-node.

Procedure

  1. Log in to the Cluster Control Manager(CCM) as the customer user.
  2. Gracefully shutdown the Avaya Common Services database resource and run the following command:
    pre-infra-upgrade

    Wait for the command to complete before continuing.

  3. Log in to vCenter as an administrator or with the account used to deploy the single-node cluster.
  4. Click the VMs and Templates tab.
  5. Locate and right-click the single-node cluster VM in the folder you designated during your cluster deployment.
  6. Right-click the node and click Power > Shut Down Guest OS.

Next Steps

When the cluster node is powered off, take a VMware VM snapshot of Cluster Control Manager and all the cluster nodes. This step is optional.