Installation checklist

Last Updated : Apr 08, 2022 |

Use the following checklist to complete the installation of the server.

No.

Task

Description

Notes

1

Discharge electrostatic energy.

See Electrostatic discharge.

2

Inspect package contents.

See Package contents (New ASP 130 R6.0.x Dell R660xs only).

3

Install the server using the rail kit.

See Installing the server (New ASP 130 R6.0.x Dell R660xs only).

4

Attach cables.

See Attaching cables.

5

Connect power.

See Connecting power.

The following items are application-specific. Refer to the application-specific documentation for additional information on:

  • Initial configuration and IP address assignment.

  • Ethernet port cabling.

  • Application shutdown procedures.