Use the following checklist to complete the installation of the server.
No.
Task
Description
Notes
1
Discharge electrostatic energy.
See Electrostatic discharge.
2
Inspect package contents.
See Package contents (New ASP 130 R6.0.x Dell R660xs only).
3
Install the server using the rail kit.
See Installing the server (New ASP 130 R6.0.x Dell R660xs only).
4
Attach cables.
See Attaching cables.
5
Connect power.
See Connecting power.
The following items are application-specific. Refer to the application-specific documentation for additional information on:
Initial configuration and IP address assignment.
Ethernet port cabling.
Application shutdown procedures.