When selecting a location for the Branch Gateway or EM200 installation, ensure that you can connect it to the supplied secondary ground conductor. If the location does not meet this requirement, contact a licensed electrician to install a supplementary ground conductor per Article 250 of the National Electrical Code (NEC).