If the switch validates an adjunct-supplied call route, the following operations occur:
Vector processing in the VDN that contains the initiating adjunct routing link command terminates immediately.
The switch signals the ASAI adjunct that the route is accepted.
The switch routes the call to the destination specified by the ASAI adjunct.