Installation checklist

Last Updated : Oct 30, 2026 |
Prolog information
Use the following checklist to complete the installation of the server.
No.
Task
Description
Notes
1
Discharge electrostatic energy.
2
Inspect package contents.
3
Install the server using the rail kit.
4
Attach cables.
5
Connect power.
The following items are application-specific. Refer to the application-specific documentation for additional information on:
  • Initial configuration and IP address assignment.
  • Ethernet port cabling.
  • Application shutdown procedures.