You can use the Report Scheduler feature with the Communication Manager features. With this feature, you can run the list, display, and test commands with the schedule qualifier.
When you run a command with the schedule option, the system generates a Job Id. You can schedule a maximum of 50 reports for printing. The Report Scheduler feature specifies the day and time of the day for printing each report.
You can use the system administrator login, maintenance login, and other logins to schedule reports.