IP Base Station Installation Requirements

Last Updated : Mar 09, 2021 |

Information

  • Avaya Wireless DECT SARI.
  • Base Station IP Addresses.
  • Detailed plans from the site survey indicating the intended base station locations, LAN sockets and if necessary power supply outlets.

Parts

  • Base station
    Includes:
    • Base station.
    • Two 3.5mm screws and two 6mm wall plugs suitable for wall mounting onto a solid wall (brick or similar).
    • 1.2 metre (4 foot) LAN cable. If this is replaced with a longer cable the replacement should be a CAT5 Ethernet LAN cable.
    Important:
    For IP Office Release 10.0 and higher, IPBS1 base stations are only supported as slave radio base stations. IPBS1 base stations are no longer supported in other roles, for example as master base stations. For systems being upgraded, any existing IPBS1 base station being used in a non-slave role must first be replaced in that role with an IPBS2/IPBS3 or IPBL1.
  • If using Power over Ethernet:
    • The base station supports Power over Ethernet, IEEE 802.3af, class 2.
  • If not using Power over Ethernet:
    • Base station power supply unit.
      Required if not using Power over Ethernet to power the base station. Note that the base station power supply units include an 8 metre (26 feet) cable from the PSU to the base station. Check that you have the correct type of power supply unit for the locale.
      • BSX-0013: Europe (except United Kingdom).
      • BSX-0014: United Kingdom.
      • BSX-0015: USA/Canada.
      • BSX-0016: Australia.
    • Mains power outlet socket.
  • LAN Socket.

Tools

  • Programming PC with Avaya Wireless DECT software.
  • Web browser.
  • Drill and drill bits suitable for the selected wall mounting position of the IPBS.
  • Screwdrivers for use with the screws selected for IPBS wall mounting.