Stopping a Scheduled Job

Last Updated : Nov 17, 2020 |
Prolog information

To stop a scheduled job:

If a scheduled job is stopped it cannot be restarted.
  • You cannot pause, resume or stop jobs that were started immediately, for example upgrades that were not scheduled.
  1. Display the list of scheduled jobs. See Viewing Scheduled Jobs.
  2. Select the checkbox next to the required jobs. Use the checkbox at the top of the list to select all jobs in the list.
  3. Click on Stop Stop.
  4. Click Confirm to stop the selected jobs.
  5. The Status of those jobs changes to Stopped.