Link Tear Down Test (#213)

Last Updated : Sep 29, 2023 |

This test is destructive.

This test disconnects the existing link between the system and the external output device. If the link has already been disconnected, this test just returns PASS. Each resource allocated for an output device link is released after this test.

This test runs on the following maintenance objects: