Considerations for loading pseudo-ACD data

Last Updated : Oct 30, 2024 |

Consider the following before loading data onto a pseudo-ACD:

  • You must create a pseudo-ACD as described in Pseudo-ACD administration.

  • Before loading data onto a pseudo-ACD, you must back up the data archived from an existing ACD. Review the information in Considerations for backing up data from a real ACD to load on a pseudo-ACD.

  • Set the pseudo-ACD as the current ACD before attempting to load data into it.

  • Loading a pseudo-ACD with data automatically overwrites any existing data currently used by the pseudo-ACD.

  • When created, a new pseudo-ACD has historical data storage parameters set to zero. To load data into the pseudo-ACD, the historical data storage allocation values must match or be greater than the values for the ACD from which the data was archived.

  • Storage intervals and data collection settings must be configured to match those of the ACD supplying the data. Otherwise, the process of loading data onto the pseudo-ACD might fail.