Consider the following when working with vector names in the Dictionary:
To administer vectors, the Call Vectoring feature must be enabled on the ACD switch.
You can assign a name to a vector even if the steps to the vector have not been assigned.
The number of available vectors depends on the switch type.
If you make changes to vector names when a report that includes those vectors is running, you must exit the report and run it again to see the changes.